Addition Update 2
August 27, 2016, by Todd Neva We have shingles, soffits, and windows installed. The siding is on two thirds of the caregiver’s addition, and the rough-in plumbing for the in-floor…
August 27, 2016, by Todd Neva We have shingles, soffits, and windows installed. The siding is on two thirds of the caregiver’s addition, and the rough-in plumbing for the in-floor…